Project Overview

A property owner in a South Coast estate contacted us with a serious sewer line problem. Tree roots had infiltrated their old clay pipes, causing repeated blockages and backups. They needed a permanent solution that wouldn’t destroy their carefully landscaped garden.

The Problem

Initial Inspection Revealed:

  • Extensive root intrusion throughout the clay sewer line
  • Multiple sections of collapsed piping
  • Improper grading causing drainage issues
  • The line ran directly under established landscaping

Traditional replacement would have required:

  • Excavating a 2-meter deep trench across the property
  • Removing mature trees and destroying the garden
  • A week of heavy equipment on-site
  • Extensive restoration work after plumbing repairs

Our Solution: Trenchless Pipe Relining

We recommended Cured-in-Place Pipe (CIPP) lining as the ideal solution.

The Process

Day 1: Preparation & Cleaning

  • Hydro-jet cleaning to remove all debris and roots
  • Camera inspection to map exact damage locations
  • Cleanout access points installation

Day 2: Relining Installation

  • Saturated felt liner inserted into existing pipe
  • Inverted using air pressure, creating a “pipe within a pipe”
  • Cured with hot water for 4 hours
  • Created a seamless, jointless new pipe

Day 3: Final Inspection & Restoration

  • Camera inspection confirming perfect installation
  • Reconnection of all lateral lines
  • Minimal site restoration required

The Results

Benefits Achieved:

  • Zero excavation required - garden preserved
  • Completed in 3 days vs. estimated 7-10 days for traditional
  • 50-year lifespan on the new pipe
  • Improved flow with smoother interior
  • Root-proof - no future intrusion possible
  • Minimal disruption to the property

Before & After

Before:

  • Recurring blockages every 2-3 months
  • Foul odors in the garden
  • Slow drainage throughout the house
  • Risk of complete system failure

After:

  • Trouble-free operation
  • No odors
  • Perfect drainage
  • 50-year warranty on the relined section

Technical Details

  • Length of pipe relined: 28 meters
  • Pipe diameter: 110mm
  • Method: CIPP inversion lining
  • Curing method: Hot water
  • Warranty: 50 years

Client Feedback

“We were dreading having our garden dug up, but Derwent’s trenchless solution was amazing. They finished in 3 days, our garden was untouched, and we’ve had no problems since. Highly recommend!” - Michael, South Coast Estate

Experiencing sewer line issues? Contact us for a free camera inspection:

  • Steve: 082 893 1742
  • Goan: 076 198 3858

Share this project

Show others our quality workmanship